![]() The bridge rests on 62 piers, of which the 44 main piers are 250 m (820 ft) apart. Most of the curved bridge is 40 metres (131 ft) above water, and it contains a 60 m (197 ft) high navigation span to permit ship traffic. It is a multi-span beam bridge with a post-tensioned concrete box girder structure. The bridge is a two-lane highway toll bridge that carries the Trans-Canada Highway between Borden-Carleton, Prince Edward Island (at Route 1) and Cape Jourimain, New Brunswick (at Route 16). ![]() ![]() Heading northbound with Prince Edward Island in view.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |